Record net dimensions and the thickness or cross-section from your plan. Avoid double-counting intersections. Help with this step →
Agree strength, aggregate, exposure requirements, slump and any specified admixtures with the responsible project team and supplier. Help with this step →
Separate measured volume, your allowance, supplier increments and any minimum billed volume. Help with this step →
Ask about material, delivery, short-load, waiting, pumping, tax and any cancellation policy. Confirm what is not included. Help with this step →
Discuss gates, road limits, turning room, overhead obstacles, discharge location and whether a pump is needed. Help with this step →
Arrange site preparation, forms, reinforcement, placement, finishing, cleanup and washout responsibilities. Help with this step →
Confirm arrival windows, unloading time, order changes, weather arrangements and the supplier contact. Help with this step →
Have the curing method and materials specified before placement; drying is not the same as curing. Help with this step →
Keep your supplier details together
Save the quote date, order quantity, mix specification and confirmed charges in the project planner. This checklist helps prepare a conversation; it is not an engineering approval or a complete site safety plan.