Concrete Quote Comparison

Put two supplier quotes on the same footing. Compare billed quantities, fees and known costs, with incomplete scopes clearly marked.

Your project

Project sketchFrom your inputs
Quote AQuote B0 USD / yd³0 USD / yd³
Schematic, not to scale. Drawn pieces do not represent the purchase count.
Editable planning allowance; actual waste varies.
Quote A · pricing
Use a local quote. Blank means unknown.
Example only; confirm with your supplier.
Change only if your supplier bills a minimum quantity.
Quote A · fees & tax
Enter 0 if confirmed not applicable.
Enter 0 if confirmed not applicable.
Enter 0 if confirmed not applicable.
Enter 0 if confirmed not applicable.
Enter 0 if confirmed not applicable.
Enter 0 if confirmed not applicable.
Enter 0 if confirmed not applicable.
Check what your quote taxes; enter 0 if not applicable.

Use only after confirming those charges do not apply.

Quote B · pricing
Use a local quote. Blank means unknown.
Example only; confirm with your supplier.
Change only if your supplier bills a minimum quantity.
Quote B · fees & tax
Enter 0 if confirmed not applicable.
Enter 0 if confirmed not applicable.
Enter 0 if confirmed not applicable.
Enter 0 if confirmed not applicable.
Enter 0 if confirmed not applicable.
Enter 0 if confirmed not applicable.
Enter 0 if confirmed not applicable.
Check what your quote taxes; enter 0 if not applicable.

Use only after confirming those charges do not apply.

How the calculation works

Each quote applies its own order increment and minimum charged quantity, then adds entered fees and tax. A lower-priced winner appears only after both scopes are complete.

A worked example

At 3 yd³, $150/yd³ plus $200 in fees totals $650. Another quote at $170/yd³ plus $50 totals $560, before any other applicable costs.

Why can a higher price per yard produce a lower total?

Delivery, short-load charges, minimum billed quantities and other fees can outweigh a lower material rate. Compare complete totals for the same scope and order quantity, not only the price per cubic yard.

What to check before using the result

  • A low unit price does not always mean a lower final bill.
  • Minimum charged volume and short-load fees are separate fields: enter both only if your quote actually charges both.

Save this estimate to compare it later, or print a copy. Saved estimates live in this browser. Shared links contain the inputs you choose to share.

References & product information

Method prepared 2026-10-21. See our calculation and editorial methods. Spotted a problem? Tell us about it.