Read the yield before choosing a preset
QUIKRETE Concrete Mix #1101 lists approximate yields of 0.30 cubic feet for a 40-lb bag, 0.375 for a 50-lb bag, 0.45 for a 60-lb bag, 0.60 for an 80-lb bag and 0.675 for a 90-lb bag. Using those particular yields gives the following purchases for exactly one cubic yard, and for one yard plus a 10% allowance.
| Bag | Yield per bag | Bags for 27 ft³ | With 10% extra |
|---|---|---|---|
| 40 lb | 0.30 ft³ | 90 | 99 |
| 50 lb | 0.375 ft³ | 72 | 80 |
| 60 lb | 0.45 ft³ | 60 | 66 |
| 80 lb | 0.60 ft³ | 45 | 50 |
| 90 lb | 0.675 ft³ | 40 | 44 |
Check the exact product. For example, the two manufacturer sheets linked below give different yields for their 90-lb products. A bag-weight preset is only a starting convenience.
Allow for the project, then round bags once
Suppose the measured volume is one yard and you choose 10% extra. The target is 29.7 cubic feet. At 0.60 cubic feet per bag, 29.7 ÷ 0.60 = 49.5, so the purchase is 50 bags. Their labeled yield totals 30 cubic feet.
For several small sections made from the same product, add their required volumes before rounding bags. Rounding each section independently can buy more bags than rounding one shared batch total. Keep separate totals when different products are required.
Compare the work as well as the bag price
Fifty 80-lb bags represent 4,000 lb of dry packaged material before pallets or other supplies. Plan delivery, storage and handling around the actual purchase. Adding water changes the placed mixture; dry bag weight is not a substitute for finished concrete density.
The bag calculator accepts a custom yield. For pallet purchases, check the supplier's bag count in the pallet calculator. Compare the complete purchase against a local delivered quote in ready-mix versus bags. Ask whether the retailer sells loose bags, full pallets or both, and use the actual pack size when rounding the purchase.
Sources & further reading
- QUIKRETE Concrete Mix #1101: product data and yields
- Sakrete High-Strength Concrete Mix: technical data
Examples illustrate arithmetic. Use project specifications and current local supplier quotes for a purchase.